Sendai Nuclear Plant Press Tour

SATSUMASENDAI, JAPAN - MARCH 26: An anti quake device is installed at a pipe to send water into the turbine to meet the tougher regulation the Nuclear Regulation Authority have set at the No.1 reactor of the Kyushu Electric Power Co's Sendai Nuclear Power Plant on March 6, 2015 in Satsumasendai, Kagoshima, Japan. The nuclear plant's No.1 and No.2 reactors will be the first to resume the operation, after the all nuclear plants have been suspended in the result of the Tokyo Electric Power Co's Fukushima Daiichi Nuclear Plant meltdown in 2011. (Photo by The Asahi Shimbun via Getty Images)
SATSUMASENDAI, JAPAN - MARCH 26: An anti quake device is installed at a pipe to send water into the turbine to meet the tougher regulation the Nuclear Regulation Authority have set at the No.1 reactor of the Kyushu Electric Power Co's Sendai Nuclear Power Plant on March 6, 2015 in Satsumasendai, Kagoshima, Japan. The nuclear plant's No.1 and No.2 reactors will be the first to resume the operation, after the all nuclear plants have been suspended in the result of the Tokyo Electric Power Co's Fukushima Daiichi Nuclear Plant meltdown in 2011. (Photo by The Asahi Shimbun via Getty Images)
Sendai Nuclear Plant Press Tour
PURCHASE A LICENCE
How can I use this image?
₹23,000.00
INR

DETAILS

Restrictions:
Contact your local office for all commercial or promotional uses.
Credit:
The Asahi Shimbun / Contributor
Editorial #:
467762690
Collection:
The Asahi Shimbun
Date created:
26 March, 2015
Upload date:
Licence type:
Release info:
Not released. More information
Source:
The Asahi Shimbun
Object name:
84515935
Max file size:
3044 x 4285 px (25.77 x 36.28 cm) - 300 dpi - 10 MB