BELGIUM-ENERGY-NUCLEAR

A photo taken on August 20, 2014 shows a nuclear power plant, in Tihange, Belgium. Reactor number 3 of the Doel nuclear plant near Antwerp and reactor number 2 of the Tihange plant have been stopped since March 25. They had already been stopped from June 2012 to June 2013 after thousands of microcracks had been discovered in their tanks. Reactors are not scheduled to restart until the Fall but could restart only in the Spring, if at all, reports the French-speaking Belgian press. AFP PHOTO / BELGA / ERIC LALMAND ** Belgium Out ** (Photo by ERIC LALMAND / BELGA / AFP) (Photo credit should read ERIC LALMAND/AFP via Getty Images)
A photo taken on August 20, 2014 shows a nuclear power plant, in Tihange, Belgium. Reactor number 3 of the Doel nuclear plant near Antwerp and reactor number 2 of the Tihange plant have been stopped since March 25. They had already been stopped from June 2012 to June 2013 after thousands of microcracks had been discovered in their tanks. Reactors are not scheduled to restart until the Fall but could restart only in the Spring, if at all, reports the French-speaking Belgian press. AFP PHOTO / BELGA / ERIC LALMAND ** Belgium Out ** (Photo by ERIC LALMAND / BELGA / AFP) (Photo credit should read ERIC LALMAND/AFP via Getty Images)
BELGIUM-ENERGY-NUCLEAR
PURCHASE A LICENCE
How can I use this image?
₹23,000.00
INR

DETAILS

Restrictions:
Contact your local office for all commercial or promotional uses. Full editorial rights UK, US, Ireland, Italy, Spain, Canada (not Quebec). Restricted editorial rights elsewhere, please call local office.Belgium Out
Credit:
ERIC LALMAND / Stringer
Editorial #:
453860428
Collection:
AFP
Date created:
20 August, 2014
Upload date:
Licence type:
Release info:
Not released. More information
Source:
AFP
Barcode:
BELGA
Object name:
Par7953847
Max file size:
4928 x 3280 px (41.72 x 27.77 cm) - 300 dpi - 4 MB