Getty Images logo

Picture taken 25 February 2004 of the Ri

RION, GREECE: Picture taken 25 February 2004 of the Rion-Antirion cable-stayed bridge under construction, crossing the 3 kilometers Corinth Gulf strait. The Rion-Antirion Bridge is the product of a seven-years construction project and will result in the world's longest cable-stayed bridge. With a suspended deck of 2,252m, the bridge features four pylons (where there are usually two) and has a reference span of 560 meters. Located in the western end of the Gulf of Corinth, the Rion-Antirion Bridge will link the Peloponnese (southern Greece) to the Greek mainland. The Bridge is also unites two major roads: the intersection of the Patras-Athens-Thessaloniki motorway and the western axis of the Kalamata-Patras-Igoumenitsa road. Because of the high seismic activity of the area, the Bridge requires sea bed reinforcement via 200 hollow steel pipe (for each pier) driven into the sea bed and topped with gravel. A 27.2m-wide deck contains two traffic lanes plus a safety lane and pedestrian walkway in both directions. AFP PHOTO ERIC FEFERBERG (Photo credit should read ERIC FEFERBERG/AFP via Getty Images)
RION, GREECE: Picture taken 25 February 2004 of the Rion-Antirion cable-stayed bridge under construction, crossing the 3 kilometers Corinth Gulf strait. The Rion-Antirion Bridge is the product of a seven-years construction project and will result in the world's longest cable-stayed bridge. With a suspended deck of 2,252m, the bridge features four pylons (where there are usually two) and has a reference span of 560 meters. Located in the western end of the Gulf of Corinth, the Rion-Antirion Bridge will link the Peloponnese (southern Greece) to the Greek mainland. The Bridge is also unites two major roads: the intersection of the Patras-Athens-Thessaloniki motorway and the western axis of the Kalamata-Patras-Igoumenitsa road. Because of the high seismic activity of the area, the Bridge requires sea bed reinforcement via 200 hollow steel pipe (for each pier) driven into the sea bed and topped with gravel. A 27.2m-wide deck contains two traffic lanes plus a safety lane and pedestrian walkway in both directions. AFP PHOTO ERIC FEFERBERG (Photo credit should read ERIC FEFERBERG/AFP via Getty Images)
Picture taken 25 February 2004 of the Ri
PURCHASE A LICENCE
How can I use this image?
₹14,000.00
INR
Getty ImagesPicture taken 25 February 2004 of the Ri, News PhotoPicture taken 25 February 2004 of the Ri, News PhotoPicture taken 25 February 2004 of the Ri Get premium, high resolution news photos at Getty ImagesProduct #:3029981
₹23,000₹7,000
Getty Images
In stock

DETAILS

Restrictions:
Contact your local office for all commercial or promotional uses. Full editorial rights UK, US, Ireland, Italy, Spain, Canada (not Quebec). Restricted editorial rights elsewhere, please call local office.This image is only available in Getty Images offices in the United Kingdom, United States, Germany (Austria, Switzerland via Germany), Hong Kong, Singapore, and Australia.
Credit:
Editorial #:
3029981
Collection:
AFP
Date created:
25 February, 2004
Upload date:
Licence type:
Release info:
Not released. More information
Source:
AFP
Barcode:
AFP
Object name:
PAR2004030113610